论文部分内容阅读
一桥飞架南北,天堑变通途。2012年12月20日,在得到唐山神威工程机械租赁有限公司(以下简称“神威公司”)总经理王得义的盛情邀请之后,记者一行早早地来到了国道102线滦河特大桥吊装施工项目现场。冬日清晨的河北迁安已然寒风刺骨,但是施工项目现场却有条不紊。已经早早来到施工现场的吊装施工人员已将地面进行平整,2台中联重科全地面起重机正原地待命,操作手也已经整装待发,各项安全措施也都充分准备,在一片鞭炮齐鸣声中,滦河特大桥首片桥梁仅用了15min便成功吊装就位,神威公司总经理王得义脸上露出了自信、满意的笑容。
A bridge fly north and south, natural moat change thoroughfare. On December 20, 2012, after receiving an invitation from Wang Deyi, general manager of Tangshan Shenwei Construction Machinery Leasing Co., Ltd. (hereinafter referred to as “Shenwei Company”), the reporter and his entourage came early to hoist the construction project of National Highway 102 Luanhe Bridge on site. Qian’an in winter early in the morning is already cold and biting, but the construction project site is methodical. Construction workers have already arrived early on the ground hoisting construction workers have been smooth, 2 Zoomlion all terrain crane is waiting on the ground, the operator has ready to go, the safety measures are also fully prepared, in a whistle of chorus, Luanhe Bridge first bridge only 15min successfully hoisting in place, Divine General Manager Wang Deyi face revealed a confident, satisfied smile.