论文部分内容阅读
一、新毛谷桥的桥墩爬模 新毛谷桥墩身高25米,圆形截面直径3.50米,于1980年7月至1981年3月建造。爬模施工按照图1表示的程序进行。 A(1)在基础顶面组装主桁架。
First, the new Maugu bridge pier model New Maugu bridge pier height of 25 meters, a circular cross-section diameter of 3.50 meters, in July 1980 to March 1981 construction. Climbing construction in accordance with the procedures shown in Figure 1. A (1) Assemble the main truss on the base top.