1工程概况上海城市轨道交通明珠线一期工程共有19个车站,其中大部分为二、三层车站,笔者承担江湾镇车站的结构设计。该站为“高架三层双侧式站台”的车站,一期建成车站总长度为150米,远期发展为190米,按8节车厢编组,车站宽22.2米,檐口高度17.4米,沿车站总长三分点处
1 Project Overview Shanghai Urban Rail Transit Pearl Line Phase I project a total of 19 stations, most of them for the second and third floors of the station, I assume Jiangwan town station structure design. The station is “elevated three-tier two-station platform,” the station, a completed station total length of 150 meters, the long-term development of 190 meters, according to 8 car grouping, the station width of 22.2 meters, the cornice height of 17.4 Meter, along the station total length of three points