论文部分内容阅读
1方案的提出1988年汕尾建市初期,首先碰到缺水缺电二大问题。原汕尾镇主要靠库容456万m3的赤岭水库供水,日供水量约4000t,供水断断续续,不能满足原有居民生活生产用水。解决供水是新市建设面临的主要任务。新市供水工程规划设计,由某设计院承担,规划分近远两期工程建设:
1 The proposal of the scheme In the early days of Shanwei City’s construction in 1988, it first encountered the two major problems of water shortage and power shortage. The original Shanwei Town relied mainly on the reservoir of Qiling Reservoir with a storage capacity of 4.56 million m3. The daily water supply volume was about 4,000 tons, and the water supply was intermittent and could not satisfy the original residents’ living production water. Solving water supply is the main task facing the construction of the new city. The planning and design of the new city water supply project is undertaken by a design institute, and the planning is divided into two phases: