某水电站建设过程中,堆渣场、石料场、土料场及移民安置点发生了变化,以致已实施的水土保持方案与工程开工前批复的水土保持方案报告书设计方案有所变化,需编制电站水土保持方案设计变更报告,经审查后提交给水土保持审批部门备案,达到水电站竣工验收要求。
During the construction of a hydropower station, heaps and dams, stone quarry, soil material yard and resettlement sites have changed so that the implementation of the soil and water conservation program and the design proposal of the soil and water conservation program before the commencement of construction have changed. Soil and water conservation program design change report, after review submitted to the soil and water conservation examination and approval department for the record, to meet the hydropower station acceptance requirements.