理财观念要突破 产权管理要突破 聚财方法要突破 价格体系要突破 管理手段要突破“八五”期间,我省水利事业的社会地位和水利 工程的建设规模、质量、效益都上了一个新台阶。水利经济也得到了长足发展。在这些巨大成就中.我们财务工作者参与决策管理.千方百计筹措资金,努力做好后勤保障,功不可没。财务部门为水利建设筹资26亿元,是“七.五”的2.7倍;清产核资工作得以完成,盘清了家底,为下一步水利产权改革奠定了基础;通过试行企业化管理.推行目标管理责任制和承包经营责任制.对基建工程实行拨改贷.协助计划部门推行“三制(业主制、招标制和工程监理制),从而为水利管理单位注入了活力。 回顾过去.可以说“八五”期间我省水利财务改革步子较大,成效较为突出。“九五”水利奋战已拉开序幕,当前,我省水利发展形势可以用一句话六个字概括,“天时、地利、人和”都很好。“九五”期间,我省水利建设任务十分繁重:新增有效灌溉面积200万亩,建设节水灌溉面积300万亩,新增“四田”400万亩,为建成500万亩“吨粮田”创造条件;建设一批蓄水、调水、引水工程,增加蓄水、引水能力12亿立方米,缓解工农业和城乡缺水问题,治理水土流失面积15000平方公里,新修堤防300公里;水利经济的总产值要力争达到40亿元,比“八五”?
To break the concept of financial management to break through the method of collecting money To break through the price system To break through the management means To break the “Eighth Five-Year” period, the social status of our province’s water conservancy and water conservancy construction scale, quality, efficiency are on a new level . Water economy has also made great strides. In these great achievements, our financial workers are involved in decision-making management and make every effort to raise funds and work hard to achieve logistical support. The finance department raised 2.6 billion yuan for water conservancy construction, 2.7 times that of “July 5”; the work of clearing assets and checking assets was completed and the bottom of the family was cleared, laying the foundation for the next reform of water conservancy property rights; implementing the pilot project of enterprise management Management responsibility system and contracting management responsibility system.Consider the reform of infrastructure projects to assist the planning department to promote the “three system (owner system, tendering system and project supervision system), thus infusing water for the management unit .Review of the past .Can say During the period of the Eighth Five-Year Plan, the reform of water conservancy finance in our province has made a big step forward and the achievements have been quite outstanding. Now that the ”Nine-Five“ water conservancy campaign has kicked off, at present, the situation of water conservancy in our province can be summarized in six words: During the Ninth Five-year Plan, the task of water conservancy construction in our province was very heavy: 2 million mu of new effective irrigation area, 3 million mu of water-saving irrigation area and 4 million mu of ”Si Tian“ were newly added as Build 5000000 acres of ”tons of grain“ to create conditions; build a number of water, water diversion, water diversion project, increase water storage, water diversion capacity of 1.2 billion cubic meters, alleviating industrial, agricultural and urban water shortage problem, control of soil erosion area of 15000 square Km, New embankment 300 km; the total output value of water conservancy should strive to reach 4 billion yuan, more than the ”Eighth Five-Year"?