我省公路技术状况差的旧木桥(以下简称旧桥)改造工作,在各级党委的正确领导和广大群众的大力支持下,1964年打了第一个歼灭战。一年内改造的旧桥相当于十五年来改造旧桥总长度的两倍。建成的桥梁一般质量较好,造价较低,每米造价平均1,110元。通过一年来的实践,说明了我们在今明两年内消减全部最旧桥梁的打算是完全可能办得到的。同时,也为今后分期分批地改造全省本面桥找到了方向,取得了经验。歼灭战的提出改造旧桥歼灭战,是去年二月厅党委会议提出
In 1964, the transformation of the old wooden bridge with poor technical condition in our province (hereinafter referred to as the “Old Bridge”) was first annulled in 1964 at the correct leadership of the party committees at all levels and with the strong support of the broad masses. The old bridge converted within a year is equivalent to twice the total length of the old bridge converted in 15 years. Built bridges are generally of better quality and lower cost, costing an average of 1,110 yuan per meter. The practice of the past year shows that it is entirely possible that we can reduce all the oldest bridges in the next two years. At the same time, it also found the direction for the reconstruction of the current bridge of the province by stages and in batches, and gained experience. The annihilation put forward to remodel the old bridge annihilation, was put forward by the party committee meeting in February of last year