外滩交通综合改造分一期工程和二期工程,一期工程于1992年2月开工,1992年9月26日建成.二期于1992年5月实施,1993年12月通车.一期工程由外滩防汛墙外移工程、外滩地区道路拓宽改建工程和外滩地区绿化景点工程等三个部分组成.经过综合改造的外滩一期工程沿江设置32只呈半弧形的观光平台.64只庭式宫灯和八座花岗石制成的艺术灯柱,显得格外古朴黄雅;防汛墙内是占地11960平方米的空厢,大部分作为停车库.全长826米的中山东一路.由原来的六车道拓宽至十个道,横穿中山东一路的北京东路、南京东路、福州路三个人行地道全部用乳白色的地砖装饰一新.地道采用新型的射灯和亚光灯照明,使人行地道显得明亮清晰.
The comprehensive reconstruction of the Bund was divided into Phase I and Phase II. The first phase was started in February 1992 and completed on September 26, 1992. The second phase was implemented in May 1992 and was opened to traffic in December 1993. The first phase of the project consists of There are three parts: the Bund flood control wall relocation project, the Bund area road widening and reconstruction project and the Bund area greenery attraction project. After the comprehensive transformation of the Bund Phase I, 32 semi-arc sightseeing platforms along the river have been set up. 64 court-style palace lanterns The art lamp posts made of eight granites are particularly quaint and elegant; inside the flood prevention wall are 11960 square meters of empty cars, most of which are used as parking garages. The total length of 826 meters is in the middle of Shandong all the way. The six lanes widened to ten roads. The three footpaths of Beijing East Road, Nanjing East Road, and Fuzhou Road, which cross Zhong Shan Dong Yi Road, were all decorated with milky white tiles. The tunnels use new type of spotlights and sub-light lighting. Pedestrians are bright and clear.