灵新矿是国家“八五”重点建设项目,是根据灵武矿区总体规划设计首开的国有重点煤矿。始建于1989年8月,设计能力为240万吨/年。于1997年底建成并投入生产。在矿井建设过程中,本着现代化矿井的建设际准,先后采用了具有国内先进水平的CST软启动和本布罗控制系统、皮带集中控制系统、束管监测、森透里昂安全监测系统以及计算机网络、工业电视等先进技术。同时,引进国内三套大型综采成套设备和二套综掘设备,实现了采煤、掘进、运翰、洗选、监控等生产环节的现代化管理,是宁夏目前较为先进的大型现代化矿井。
Lingxin Mine is a national “Eighth Five-Year” key construction projects, is based on the overall planning and design Lingwu mine first state-owned key coal mines. Founded in August 1989, the design capacity of 2.4 million tons / year. Built in late 1997 and put into production. In the mine construction process, in line with the construction of modern mine standards, has adopted a domestic advanced level of CST soft start and the Benro control system, belt centralized control system, beam tube monitoring, Morito Lyon safety monitoring system and computer Network, industrial television and other advanced technologies. At the same time, the introduction of three sets of large-scale fully mechanized mining equipment and two sets of comprehensive excavation equipment to achieve the modern management of coal production, tunneling, transportation John, washing, monitoring and other production links, Ningxia is currently more advanced large-scale modern mines.