前言解放以来在党的领导下,经过广大干部群众的辛勤劳动,上海水利建设取得很大的成绩,1949年至1983年累计完成土石方13.70亿立米,混凝土方264余万立米。国家投资8.33亿元,社队自筹资金和劳务投资9.25亿元。目前骨干工程布局基本定型,海圹江堤日益巩固,防洪除涝能力不断提高,电力灌溉普及,旱灾基本免除,城市防洪能力逐步提高。保障了城乡人民渡汛安全,促进了国民经济的发展。水利建设发展过程上海市水利建设发展,分为三个时期,从建国初期至一九五八年,主要是针对解放
Preface Since the liberation, under the leadership of the party and through the hard work of the broad masses of cadres and the masses, great achievements have been made in water conservancy construction in Shanghai. From 1949 to 1983, a total of 1.37 billion cubic meters of earth and stone were produced and 2,600,000 cubic meters of concrete were completed. 833 million yuan was invested by the state, 925 million yuan was raised by the social teams for self-raised funds and labor services. At present, the basic layout of key engineering layout, the Haihe River embankment is increasingly consolidated, flood control and waterlogging continued to improve, the popularity of electric irrigation, drought basically exempt, and gradually improve the ability of urban flood control. Safeguarding the flood safety of urban and rural people and promoting the development of the national economy. Water conservancy construction development Shanghai water conservancy construction development, divided into three periods, from the early days of 1949 to 1958, mainly for the liberation