论文部分内容阅读
无论是素有“聚宝盆”之称的柴达木盆地,还是毗邻黄河上游梯级“龙头”电站的海南藏族自治州共和县光伏产业园,抑或是青海省会西宁的国家级经济技术开发区,如今都已成为全国乃至世界光伏产业界瞩目的焦点。2011年,以中电投黄河上游水电开发有限责任公司格尔木20万千瓦光伏电站为代表的42个项目同时建成,并网装机首次突破100万千瓦,发电量约占青海电网总量的4%,远远超过当年不到1%的全国水平。2012年,青海光伏发电增速不减,当年并网及在建规模再超100万千瓦。据中电联统计年报显示,2012年全国并网光伏发电总装机为328万千瓦,由此推算,青海并网光伏发电装机约占全国并网光伏发电装机总容量的60.97%。
Whether it is the Qaidam Basin known as “cornucopia” or the photovoltaic industry park of the Republic of Hainan in the Tibetan Autonomous Prefecture adjacent to the upper reaches of the Yellow River or the national-level economic and technological development zone in Xining, Qinghai Province , Now have become the focus of the photovoltaic industry in the country and the world. In 2011, 42 projects represented by 200,000-kilowatt photovoltaic power station of Golmud, the upstream hydropower development company of the Yellow River, were completed at the same time. The installed capacity of the grid exceeded 1 million kilowatts for the first time and generated about 4% of the total power grid in Qinghai. More than less than 1% of the national level. In 2012, the growth rate of photovoltaic power generation in Qinghai does not diminish. In the same year, the scale of grid-connected and under construction exceeded 1 million kilowatts. According to the CEC annual report shows that in 2012 the total installed capacity of grid-connected photovoltaic power generation was 3.28 million kilowatts, which estimated that Qinghai grid-connected photovoltaic power generation installed capacity accounted for about 60.97% of the total installed capacity of grid-connected photovoltaic power generation in the country.