荆江分洪区渠道工程的设计线都是通过大小湖泊和利用旧有的老沟,有大量的水、淤泥、浸水,并有湖草和菱角,这级施工时增加了困难。但由於党委和指挥部的正确领导,广大民工和干部的积极努力,经过三个年头的时间,於1955年3月基本上先成了25公里长的渠道工程,为荆江分洪区的农业生产创造了有利条件。同时,在施工过程中也摸索了一些渠道工程施工的方法和经验。兹综合於此,供作参考。
Jingjiang flood diversion channel project design lines are through the size of the lake and the use of old ditch, a large amount of water, silt, flooding, and lake grass and water chestnut, this level of construction increased the difficulty. However, due to the correct leadership of the party committees and commanders and the vigorous efforts of the vast numbers of migrant workers and cadres, after three years, basically it became a channel project of 25 kilometers long in March 1955 to create agricultural production for the flood diversion area in Jingjiang The favorable conditions. At the same time, in the construction process also explored a number of channel construction methods and experience. Hereby incorporated by reference for all purposes.