在集中供热的热水锅炉房中,并联运行的锅炉居多,不同设计出口温度并联使用出现的事故十分常见,应引起大家足够的重视。现以DZL10 5-1.0/115/70-All与DZL7-/1.0/95/70-All锅炉并联使用为例,分析问题产生的原因及解决办法。1原因对以上两台锅炉检验时发现,7MW的锅炉运行5个供热周期,没发现问题。而10.5MW的锅炉运行不到一个供热周期,炉膛内就发生多处爆管,有的水冷壁管胀粗,严重弯曲,且管壁有过热现象,部位均在水冷壁管上端,如图1所示。
In centralized heating of hot water boiler room, the boiler is running in parallel with different design exit temperature parallel use of the accident is very common, should arouse enough attention. Now DZL10 5-1.0 / 115/70-All and DZL7- / 1.0 / 95/70-All boiler used in parallel as an example to analyze the causes of the problem and solutions. 1 reasons for the above two boiler inspection found that 7MW boiler running five heating cycles, did not find the problem. While the 10.5MW boilers run less than one heating cycle, multiple squibs occurred in the furnace, some of them were bulged, severely bent, and the pipe wall had overheating, all of which were in the upper part of the water wall tube, as shown in the figure 1 shown.