论文部分内容阅读
2000年9月27日~29日,10月10日~12日陕西院开展了第一次内部质量体系审核。为了搞好第一次内审,9月25日院里召开了动员大会,参加会议的有院级主管领导,各职能部门负责人,专业室负责人和全体内审员。孙平安院长在大会上作了讲话,他指出,这次内审分两个阶段进行,解决两个层次的问题:第一阶段内审主要解决第一层次的问题,即态度问题,执行不执行的问题;第二阶段内审要解决第二层次的问题,即执行质量体系文件的好坏问题,也
From September 27 to 29, 2000 and from October 10 to December 12, Shaanxi Institute carried out the first internal quality system audit. In order to do a good job of the first internal audit, September 25 mobilization meeting held in the yard, attended the meeting of the leadership in charge of the hospital, the heads of various functional departments, professional room heads and the entire internal auditor. President Sun Pingan delivered a speech at the conference. He pointed out: This internal audit is divided into two phases to solve two levels of problems: the first phase of internal audit mainly solves the first level of problems, namely, the problem of attitude and implementation Implementation issues; the second phase of the internal audit to address the second level of problems, that is, the implementation of quality system documentation of the good and bad issues,