位于黄河上游青海省境内的龙羊峡水电站第一台机组即将投产发电了,她象一颗灿烂的明珠,在青藏高原上大放光彩。龙羊峡工程是国家重点建设项目之一,1976年初开工兴建,同时进行补充勘测设计工作。由于广大建设者的精心设计、精心施工,艰苦奋斗,努力拼搏,1979年12月工程截流一举成功;1982年6月开始浇筑拦河大坝混凝土,从此巍峨的大坝,从“龙宫”中节节矗起;1986年10月15
The first unit of Longyangxia Hydropower Station, located in the upper reaches of the Yellow River in Qinghai Province, is about to put into operation. She is like a brilliant pearl and shines brightly on the Qinghai-Tibet Plateau. Longyangxia Project is one of the key national construction projects, started construction in early 1976, at the same time to supplement the survey and design work. As a result of careful design of the majority of builders, meticulous construction, hard work and hard work, in December 1979 project closure success in one fell swoop; June 1982 began pouring dam concrete, from the towering dam, from the “Dragon Palace” in the section Festival rises; October 15, 1986