北京工人体育场加固改建工程施工

来源 :建筑技术 | 被引量 : 0次 | 上传用户:mokung1
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
第十一届亚运会主会场——北京工人体育场建成于1958年,建筑面积86000m~2,平面呈椭圆形,外围周长约743m,为4层框架结构。一层高5m,二层、三层高3.4m,四层上部有闷顶供排气用,首层顶部向外挑出4m,建筑物最高点檐口标高为23.89m。作为第十一届亚运会的主会场,开幕式、闭幕式和足球比赛将在这里举行。为适应亚运会的使用要求,须对原有主体结构进行加固,并对内部房间进行改造,设贵宾室、组委会用房、新闻发布中心和电视转播室,主席台两侧增 The Beijing Workers Stadium, the main venue of the 11th Asian Games, was completed in 1958. It has a building area of ​​86000m2, an oval plane, and a perimeter of 743m. It is a four-story frame structure. The first floor is 5m high, and the second floor and the third floor are 3.4m high. The upper part of the fourth floor has stuffy ceilings for exhaust. The top of the first floor is 4m outward, and the highest elevation of the building is 23.89m. As the main venue for the 11th Asian Games, the opening ceremony, closing ceremony and football match will be held here. In order to meet the requirements for the use of the Asian Games, the original main structure must be reinforced, and the interior rooms must be reconstructed. The VIP room, the organization committee room, the press release center, and the television broadcasting room should be set up on both sides of the rostrum.
其他文献
跨入21世纪,社会的日益进步,科技的飞速发展,使得传统的学科界限变得越来越模糊。文理相通,学科相融已是势在必行,时代呼唤视野开阔,善于创造的复合型人才。中考、高考也突出了这一点。所以,注重多学科知识的相互交叉与综合,构筑整体知识结构,实现多点渗透,考查同学运用多学科知识:综合分析解决有关生产、生活、社会问题的能力,已成为中考命题的又一热点。为了帮助同学们更好地进行学科渗透的学习和训练,笔者愿将教学