论文部分内容阅读
本文结合工程试验,叙述了火电厂山谷灰场设计中挡灰坝的反滤料设计,利用灰渣加高挡灰坝体,以及土工织物的应用,山谷灰场的排水和泄洪等有关问题。
In this paper, the engineering experiment is described, the design of the filter cake of the ash dam in the design of the valley ash field in the thermal power plant is described, the problems of the drainage and flood discharge of the ash field are discussed.