The ADS Injector II is a linear superconducting accelerator, which is made up of the four vane type RFQ, MEBTand superconducting cavities. The amplitude and pha
In 2015, the total operation time is 6 720 h, including 4 150 h for experiments, 1 300 h for ion source tuning and beam changing, 680 h for machine preparation