论文部分内容阅读
一、概述 宝钢二期工程生活水项目,全部采用国内设计、供货的方式进行建设,每天水量为25000吨。待市政水厂建成后,将转为宝钢三期工程工业用过滤水。为适应八十年代自动化水平,本项目对自动控制系统提出了较高的要求。 在工艺上,我们采用了用压力过滤器进行微絮凝接触过滤的新技术,控制设备达125台套。 由于原水的水质不够稳定,同时随着季节的变
I. Overview Baosteel Phase II project of domestic water project, all using the domestic design, delivery of the way to build a daily volume of 25,000 tons of water. After the municipal waterworks are completed, it will be converted to Baosteel Phase III industrial filtration water. In order to meet the automation level in the 1980s, the project put forward higher requirements for the automatic control system. In the process, we use a pressure filter microfilter contact filtration of new technologies, control equipment up to 125 sets. As the raw water quality is not stable enough, at the same time as the seasons change