【摘 要】
:
Under vacuum conditions,radon is completely condensed on a small metal surface through the precise control of the condensation temperature gradient.The absolute
【机 构】
:
Radiation Metrology Division,
【出 处】
:
Annual Report of China Institute of Atomic Energy
论文部分内容阅读
Under vacuum conditions,radon is completely condensed on a small metal surface through the precise control of the condensation temperature gradient.The absolute measurementof radon activity can be achieved by the small solid angle alpha method with a semiconductor detector,through the measurements and corrections of several of factors.In this method,the
Under vacuum conditions, radon is completely condensed on a small metal surface through the precise control of the condensation temperature gradient. The absolute measurement of radon activity can be achieved by the small solid angle alpha method with a semiconductor detector, through the measurements and corrections of several of factors.In this method, the
其他文献
In order to investigate the industrialization of medical cyclotron,a PET cyclotron has been designed at CIAE to extract 14 MeV,200μA proton beam,which can meet
本文分析了当前高校健身健美运动现状,探究了在教学过程中所存在的问题和不足,并有针对性的提出了加强高校健身健美运动的具体建议措施,以推动健身健美运动在高校的正常有序
2015年以校园足球为突破口的学校体育迎来了新的发展机遇,这一年学校体育尤其是校园足球空前繁荣发展,包括体育教学、训练、竞赛改革等,从高层重视、社会认识到基层实践,都进
There will be large amounts of radioactive liquid wastes into the sea and this will cause pollution at the coastal nuclear power plant accident.For assessing th
Betatron is a kind of accelerators that accelerates electron using electromagnetic induction method.Betatron has small size,high energy low dose and can be made
Uniformity is very important for radioactive reference material and should be solved in the process of preparation.Radioactive hot spot is exact the crucial fac
In November 2014,the nuclear emergency and radiation monitoring vehicle(Fig.1)based on the capacity building of emergency response teams belonged to the SASTIND
自20世纪80年代以来,由于西部地区众多资源型城市的矿产资源面临枯竭,其经济社会发展受到严重的影响,各资源枯竭型城市开始纷纷谋求城市转型。然而,无论是从理论的研究还是从
1 Reactor operation Operation data of CARR in this years reactor start-up times are 7:Operation duration in different power levels is about 198 hours:The maximu
HWRR operation and maintenance and a number of projects were carried out in 2014.The projects include project of HWRR transition period,project of spent fuel tr