论文部分内容阅读
宝泉抽水蓄能电站上水库主坝为沥青混凝土面板堆石坝,坝址地质条件复杂。本文通过对该坝进行二维有限元计算,分析了坝体和面板的应力变形特性,得出合理结论。
The main dam of the reservoir at Baoquan Pumped Storage Power Station is an asphalt concrete faced rockfill dam with complex geological conditions. In this paper, the two-dimensional finite element calculation of the dam, the analysis of the dam and the panel of the stress deformation characteristics, draw a reasonable conclusion.