万家寨水利枢纽引黄取水口设计

来源 :水力发电 | 被引量 : 0次 | 上传用户:xieming15898575325
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
万家寨水利枢纽引黄取水口设计, 针对黄河泥沙含量高、水库水位变化大等特点, 采用了平板闸门分层取水方案; 取水口采用坝上取水形式。取水口建筑物由拦污栅、隔水闸门及竖井、上部检修与启闭设施、坝内进水口、事故检修闸门与启闭设施组成, 具有结构简洁实用、布置紧凑合理、节约投资及运行灵活可靠等特点。 According to the characteristics of high silt content in the Yellow River and large changes of water level in reservoirs, the water intake of the Wanjiazhai Water Control Project is adopted. The water intake adopts the form of water intake on the dam. The water intake structure consists of a trash rack, a water-proof gate and shaft, an overhaul and open-close facility, a water inlet in the dam, an accident check gate and an opening and closing facility. The utility model has the advantages of simple and practical structure, compact and reasonable arrangement, investment saving and operation flexibility Reliable and so on.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
万家寨水利枢纽大坝工程混凝土总量 150 万 m 3 , 用 4 年时间基本浇完;厂房工程混凝土总量 19 万 m 3 , 浇筑工期两年多, 两项工程混凝土浇筑施工创造了高速度。在浇筑过程中业主和监理都
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
近年来全球气候发生显著变化,夏季频发高温热浪已成为世界范围内的极端天气灾害事件,严重威胁人类健康.不少国际机构与气象、环境和流行病等学科专家已开始探讨热浪对个体健
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
吴仲贤先生是我国著名的动物遗传学家、教育家、中国动物数量遗传学科奠基人,在吴仲贤先生百年诞辰之际,本刊刊发由张劳原作《事业常青藤》改编而成的纪念吴仲贤先生文章,客
本文根据工程监理现状及存在的问题,论述了做好监理工作需要注意的几个问题,并提出了对策措施.
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥