1984年1月,国家计委、国防科工委在北京召开会议,邀请国务院有关部门、浙江省、上海市及各有关设计、勘测单位的代表、专家对秦山核电厂的初步设计进行了审查。在此之前,核工业部和水电部有关单位已对该工程初步设计进行了预审。经过会审,会议认为秦山核电厂初步设计在技术上、工艺上是基本可行的,经济上是比较合理的。一致通过并建议国家批准该初步设计。同时对设计中的几个问题提出了具体的审查意见。会议认为,秦山核电厂是我国自行设计、建设的原型压水堆核电站,它的建设对促进我国核电工业发展,培养锻炼核电科技队伍,掌握核电技术有很大的意义。各有关
In January 1984, the State Planning Commission and the Commission of Science, Technology and Industry for National Defense held a meeting in Beijing, inviting relevant departments of the State Council, representatives from Zhejiang Province, Shanghai Municipality and relevant design and survey units of experts and experts to conduct a review of the preliminary design of the Qinshan NPP. Prior to this, the Ministry of Nuclear Industry and the relevant department of the Ministry of hydropower preliminary design of the project has been pre-trial. After the hearing, the meeting considered that the preliminary design of Qinshan NPP in technology, technology is basically feasible and economically reasonable. Unanimously adopted and recommended that the country approve the preliminary design. At the same time on the design of several issues put forward specific review comments. The meeting held that Qinshan NPP is a prototype PWR nuclear power station designed and constructed by our country. Its construction is of great significance to promoting the development of China’s nuclear power industry, training and nurturing the team of nuclear power technology and mastering nuclear power technology. All related