二松上游国土规划《电力规划》通过评审

来源 :东北水利水电 | 被引量 : 0次 | 上传用户:cjian024156
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
第二松花江上游流域国土规划电力规划部分评审鉴定会已于1985年8月24日在长春市松辽宾馆召开。吉林省二松上游(丰满夫坝以上)国土规划领导小组副组长、水电部松辽水利委员会副主任王永荣主持了会议,并讲了话。参加会议的有吉林省电力局、省水利厅、省计经委国土规划办公室、省社会科学院经济开发研究所、水电部东北电力设 The second Songhua River basin planning and planning of land for power planning review appraisal meeting was August 24, 1985 in Changchun Songliao Hotel was held. Wang Yongrong, deputy director of the territorial planning leading group of the second Songsong in Jilin Province (above Fengmanvba) and deputy director of the Songliao Water Resources Commission of the Ministry of Electric Power and Water, presided over the meeting and made a speech. Attend the meeting, Jilin Provincial Electric Power Bureau, the Provincial Department of Water Resources, Provincial Planning and Economic Commission Planning Office, the Provincial Academy of Social Sciences Institute of Economic Development, Ministry of Electric Power Northeast Electric Power Equipment
其他文献
水利工程的施工导流设计是影响枢纽设计的重要因素之一。导流设计合理与否,直接影响工程工期的长短。影响导流设计的重要因素之一是导流标准的选用及导流方式的确定。本文对
加强农田水利基本建设,是增强农业后劲的一项战略措施,也是贯彻落实全国全省农村工作会议精神的一项具体工作。为了更好的在我市大规模地开展农田水利基本建设工作,提高防灾
本文结合工作实际,从大树移植的原则、移植方法、栽后管理技术等几个方面阐述了河南漯河地区香樟大树移植养护措施,旨在为当地香樟移植提供技术指导。 Based on the actual
由上海石油化工研究院开发的新一代MB96(A)丙烯腈催化剂在兰州化工公司石油化工厂引进的31.2kt/a生产装置上工业应用试验获得成功,3月下旬通过了中国石化集团公司的技术鉴定。该新型催化剂于
一种测定河流悬移质含沙量的仪器已研制并进行了试验。这种仪器系悬吊在河流中,当水流流过仪器中一个振动的管子时,其振动频率发生变化,并与含沙量大小有关。在粉沙和细沙范
按照“中瑞三峡船闸结构设计技术咨询议定书”的规定,由长江流域规划办公室的勘测、岩基、水工、施工四个专业组成的第二批赴瑞工作访问四人小组,从一九八四年九月十日至十
在疯狂喜剧系列被说成是在模仿盖·里奇后,宁浩的《无人区》又被说成是对科恩兄弟《老无所依》及奥利弗·斯通《U形转弯》的致敬,甚至男主角潘肖的名字都是肖恩·潘的改写。
外伤后小儿肘关节损伤较常见的骨折是肱骨髁上骨折 ,此种骨折占肘部骨折的 65%以上。笔者以小儿低位肱骨髁上骨折为重点 ,对本病的诊断和治疗情况作以论述。1 临床资料本组
目的 :探讨抗心肌肌球蛋白抗体对小儿心脏病的诊断价值。方法 :运用酶联免疫吸附法检测了 3 0例病毒性心肌炎 (VMC)、 14例扩张型心肌病 (DCM)、 10例风湿性心脏病 (RHD)、 2
二滩水电站主体土建及导流工程国际招标文件编制工作自1987年第四季度正式开展以来,已取得了可喜的成果,现报导如下。一、施工规划 (一)施工分标二滩水电站位于高山峡谷之中