石城子截潜引水工程的建设将充分利用有限的水资源,可以缓解大南湖矿区工业用水问题。文章根据工程所处工程地质条件和水文地质条件,计算了工程集水廊道的渗流量,以满足设计要求。同时,为了保证工程设计结构安全和稳定,计算了集水廊道所受最不利荷载组合下的弯矩和剪力,按照结构承载能力极限状态对集水廊道结构配筋按照抗弯和抗剪进行了验算,得到了可靠的钢筋布设方案,为工程的顺利开展提供决策依据。
Shicheng sub-submarine diversion project will make full use of the limited water resources, can ease the South Lake mining industrial water problems. According to the project geological conditions and hydrogeological conditions, the article calculates the seepage volume of engineering water collecting gallery to meet the design requirements. At the same time, in order to ensure the safety and stability of engineering design structure, the bending moment and shear force under the most unfavorable load combination of water collecting corridor are calculated. According to the ultimate bearing capacity of structure, Scissors carried out checking, got a reliable plan layout of steel reinforcement, to provide a basis for the smooth development of the project.