论文部分内容阅读
随着建筑行业的不断向前发展,人们对于建筑节能的认识也逐渐提高,在建筑结构施工过程中斜屋面越来越多,在斜屋面施工过程中斜屋面模板支设占据着较长施工时间,直接影响着斜屋面的施工工期及整体工期,为降低工程成本,加快斜屋面模板施工进度,本文将结合现场施工情况及BIM技术理念,利用计算机放样技术,介绍斜屋面模板的快速支设方法,有一定的借鉴及参考价值。
With the continuous development of the construction industry, people’s awareness of building energy conservation has also gradually increased, more and more inclined roofs in the construction of the structure during the construction of inclined roof slab roof slab layout occupies a longer construction time , Which directly affects the construction period and the overall construction period of the inclined roof. In order to reduce the construction cost and speed up the construction progress of the inclined roof formwork, this article will combine the field construction conditions and BIM technology concept, and use the computer loft technology to introduce the rapid support method of inclined roof formwork , Have some reference and reference value.