论文部分内容阅读
综合北京丰台科技园内某基坑工程的水文地质条件,确定了该基坑支护方案,并阐述了基坑支护中护坡桩与土钉墙的施工技术,提出了施工管理控制措施,基坑边坡位移监测结果表明,该施工方案满足了质量、安全、工期等要求。
Based on the hydrogeological conditions of a foundation pit project in Fengtai Science and Technology Parks in Beijing, the support scheme of the foundation pit is determined and the construction technology of slope protection pile and soil nailing wall in foundation pit support is expounded. The construction management control measures are proposed Monitoring results of pit slope displacement show that the construction plan meets the requirements of quality, safety and construction period.