论文部分内容阅读
介绍了大高炉基础混凝土施工质量控制过程,针对基础混凝土保温过程中,出现的中心温度高,降温缓慢等现象,分析了出现成因,探讨了相对应的处理方案及改进措施。
In this paper, the quality control process of large blast furnace base concrete construction is introduced. According to the phenomena of high center temperature and slow cooling during the heat preservation process of foundation concrete, the causes of the occurrence are analyzed, and the corresponding treatment schemes and improvement measures are discussed.