论文部分内容阅读
由《砌体结构设计规范》(以下简称《砌体规范》)管理组组织的《砌体结构设计规范》GB50003送审稿工作会议于2000年7月12~18日在沈阳召开,来自各地的参加修订工作的主要专家出席了会议。会议期间代表们参观了大掺量粉煤灰砌块厂、抚顺中兴大厦12层配筋砌体试点建筑工地、发泡浇注粉煤灰珍珠岩保温层的施工示范表演,以及沈阳建筑工程学院配筋
The working conference of draft for review of draft masonry design specification GB50003 organized by Management Group of “Masonry Structure Design Code” (hereinafter referred to as “Masonry Code”) was held in Shenyang from July 12 to July 2000, The main experts who participated in the revision work attended the meeting. During the meeting, the delegates visited the large-volume fly ash block plant, the 12th floor of Fushun Zhongxing Building Reinforced Masonry Pilot Construction Site, the construction demonstration performance of foamed cast-in-fly ash perlite insulation, and the Shenyang Institute of Architectural Engineering Ribs