论文部分内容阅读
一、公路工程项目施工组织设计管理中存在的问题1.施工组织设计的内容尚未全面规范施工组织设计按其建设阶段可分为三种:设计阶段编制的施工组织计划、实施准备阶段投标前编制的施工组织设计和中标后实施阶段编制的施工组织设计。目前,根据我国发布的《交通部公路工程基本建设项目设计文件编制办法》与《交通部发布1999年版公路工程国内招标文件范本的通知》
First, the highway construction project design and management of the existing problems 1. Construction design of the content of the organization has not yet fully standardized construction design According to its construction phase can be divided into three types: the construction phase of the preparation of the construction planning organization, the preparatory phase of the preparatory phase preparation Of the construction design and implementation of the successful bidder after the implementation of the construction organization design. At present, according to the “Ministry of Communications Highway Project Capital Construction Project Design Document Compilation Methods” and “Ministry of Communications released the 1999 edition of highway engineering domestic bidding documents template notice”