汉江流域规划工作从1655年3月正式开始,由当时长江水利委员会勘测设计院规划室承担此项工作。当长江流域规划苏联专家组来到后,这项工作即在苏联专家直接指导下进行。到1956年初规划工作基本完成,3月提出汉江流域规划简要报告,供各有关方面研究讨论。各部门的同志在讨论中提出了一些问题和意见,其中一部份曾在“中国水利”及“水力发电”等杂志上刊登过。根据这些讨论的结果,又进行了补充研究及修正工作,并于1956年11月提出流域规划报告送中央审核,再征询各有关地区及有关部门的意见。最近,又根据水利部的审核意见及有关部门的意见进行了局部的补充和修正。为了集思广益,使得开
Hanjiang River Basin planning work officially began in March 1655, by the Yangtze River Water Conservancy Commission Survey and Design Institute planning room to undertake this work. When the planning of the Soviet Union’s expert group came to the Yangtze River basin, the work was carried out under the direct guidance of Soviet experts. By the beginning of 1956, the planning work was basically completed. In March, a brief report on the planning of the Han River Basin was put forward for discussion and discussion by all relevant parties. Some comrades from various departments raised some questions and opinions during the discussion. Some of them have been published in magazines such as “China Water Conservancy” and “Hydroelectric Power”. Based on the results of these discussions, additional studies and corrections were carried out. In November 1956, a river basin planning report was submitted for central review and consultation with relevant regions and departments concerned. Recently, it has also partially supplemented and amended according to the opinions of the Ministry of Water Resources and the opinions of relevant departments. To brainstorm, make it open