论文部分内容阅读
9月12日从长江航道局航道处获悉,为应对近期长江水位快速退落和三峡蓄水,长江航道局近期派遣13艘挖泥船驻守中下游重点浅险水道展开疏浚维护,保障航运安全。10日凌晨,三峡水库正式启动第九次试验性蓄水,根据国家防汛抗旱总指挥部要求,水库将在10月底或者11月争取蓄水至175m。随着蓄水影响,加之目前长江沿线大部分地区无明显降水,长江水位总体呈持续退落趋势,尤其中下游
It is learned from the channel of the Changjiang Waterway Bureau on Sept. 12 that in order to cope with the rapid fall of the Yangtze River water level and the impoundment of the Three Gorges Reservoir in the near future, the Yangtze River Navigation Bureau recently dispatched 13 dredgers to dredge and maintain the key mid-and-low-water channels to ensure the safety of navigation. On the morning of the 10th, the Three Gorges Reservoir officially started the ninth experimental storage of water. According to the requirements of the State Flood Control and Drought Relief Headquarters, the reservoir will fight for water storage to 175m by the end of October or November. With the impact of water storage, combined with no significant precipitation in most parts of the Yangtze River, the Yangtze River water level generally showed a downward trend, especially in the middle and lower reaches