论文部分内容阅读
葛洲坝电厂年发电量157亿千瓦时,是我国目前最大的水力发电基地。我们水工分厂是葛洲坝电厂的二级单位,主要从事葛洲坝水工建筑物的观测、维修,闸坝泄洪机电设备的操作,维修,葛洲坝的水库调度及三峡至葛洲坝区域的气象预测、预报。对于象葛洲坝这样大型水电厂的水工建筑物的安全管理模式,前无经验借鉴,一切从头开始摸索。我们针对葛洲坝“冬修、夏防、常年管”的生产特点,在实践中不断摸索总结经验教训,最后确立了一套切实可行的安全生产管理模式,即“○一四”安全生产管理法。
Gezhouba power plant generating capacity of 15.7 billion kwh, is China’s largest hydropower base. Our hydropower plant is a second-class unit of Gezhouba Power Plant, mainly engaged in the observation and maintenance of Gezhouba hydraulic structures, the operation and maintenance of spillway electromechanical equipment, the reservoir maintenance of Gezhouba Dam, and the weather forecast and forecast of the Three Gorges to Gezhouba Dam area. For such a large hydropower plant as Gezhouba hydropower construction safety management model, without prior experience, everything from scratch to start exploring. In response to the production features of Gezhouba “winter repair, summer defensive and perennial pipe”, we constantly grope for lessons learned in practice and finally set up a set of practicable safe production management mode, that is, “○ 14” safety production management law.