1992年我院新建起了850m~2的制剂楼,制剂楼以优良的工程通过验收紧接着进行整体净化送风设备,蒸馏设备、自动化流水线设备等安装工作。投产后又经过多次改进和完善,基本达到GMP要求。现简介如下: 一、制剂楼概况
In 1992 our hospital built a new 850m ~ 2 agent building, preparation building with good works through the acceptance followed by the overall purification of air supply equipment, distillation equipment, automated assembly line equipment and other installation work. After production and after many improvements and improvements, basically meet the GMP requirements. Are as follows: First, the profile of the preparation