论文部分内容阅读
对于大荷载单桩竖向抗压静载试验,由于工程现场不具备堆载配重条件,该文以安哥拉Nova Cimangola水泥厂5000TPD水泥熟料生产线项目单桩竖向抗压静载试验为例,通过试验方案分析对比,采用锚桩横梁反力装置快速组装技术成功的完成了该项目大荷载单桩竖向抗压静载试验,取得了很好的效果,对同类工程具有一定的指导意义。
As for the vertical compression static load test of single pile with large load, as the condition of ballast weight is not available at the project site, this paper takes vertical compression static load test of single pile of 5000TPD cement clinker production line of Nova Cimangola Cement Plant in Angola as an example, Through the comparison and analysis of the test scheme, the vertical static pressure static load test of the single-pile with large load of the project has been successfully completed with the rapid assembly technology of the counter-force device of the anchored pile beam and has achieved good results, which is of guiding significance for similar projects.