梅山铁矿是我国大型黑色金属矿山之一,采用无底柱大间距分段崩落法开采。运输工作是采矿生产的主要工序之一,涉及矿井的每个采区和采场,系统中某一环节出现故障,生产就会中断,甚至带来安全问题。该矿井下-330水平卸矿站承担着原矿的卸载工作,依靠车辆的惯性和矿车卸载时的纵向推力,使矿车自动通过卸载站并完成车辆卸载和复位,每年卸载量达400万t。1存在的问题卸矿装置安装在矿仓上部的溜矿槽口上,由固定在矿仓溜槽两侧的托轮梁、托轮、水平限位轮及卸载曲轨组成,总长21.59 m,两端与运输轨道相接,
Meishan Iron Ore is one of the large-scale ferrous metal mines in China, which is produced by subsided caving method with large spacing without bottom pillars. Transport work is one of the main processes of mining production. It involves every mining area and stope. If there is a fault in a certain part of the system, the production will be interrupted and even bring about security problems. The mine-330 horizontal unloading station undertakes the unloading work of the ore. Relying on the inertia of the vehicle and the longitudinal thrust when the unloading of the tub, the tub automatically passes through the unloading station and completes the unloading and resetting of the vehicle. The annual unloading capacity reaches 4 million tons . 1 Existing Problems The unloading device is installed on the slips in the upper part of the ore bin. It consists of a support beam, a support roller, a horizontal limit wheel and an unloading curve fixed on both sides of the ore chute, with a total length of 21.59 m and two ends Connected with the transport track,