对涟钢7号高炉活跃炉缸的措施进行了总结。7号高炉因处理炉墙结厚,边沿气流过分发展,中心气流严重不足,且长期慢风操作,反复处理导致冷却壁和风口破损漏水,高炉炉芯温度持续下降,炉缸工作状况恶化。通过采取提高原燃料质量、调整高炉操作制度、强化高炉操作管理等措施,7号高炉炉芯温度止跌回升(由375℃回升到575℃,再到700℃以上),炉缸工作状况明显改善,利用系数达到2.41,燃料比降至515.83 kg/t。
The measures of active hearth of No.7 BF in Lianyang Iron and Steel Co. No. 7 blast furnace due to the treatment of furnace wall knot thick edge of excessive development of air flow, the center of a serious shortage of air flow, and long-term slow air operation, repeated treatment led to the cooling wall and tuyere damage leakage, blast furnace hearth temperature continued to deteriorate. By taking measures such as improving the quality of raw materials, adjusting blast furnace operation system and strengthening blast furnace operation management, furnace temperature of No.7 blast furnace rebounded (from 375 ℃ to 575 ℃ and then to 700 ℃), and the working condition of furnace hearth improved obviously , The utilization factor reached 2.41, the fuel ratio dropped to 515.83 kg / t.