论文部分内容阅读
东阿修防段有十二处險工,长三万一千多米,占堤线长度的百分之五十六。随着大堤的加高,坝岸必須随之加高,其中浆砌坝加高这項工程,今年就需石料二千立米。按照过去的慣例,乱石坝用乱石加高,丁砌坝用块石加高,浆砌坝則用料石加高,目的是求得上下一致,美观整齐。可是,今年浆砌坝加高部分,計划不用料石,改用块石加高。这样既可同样起到防御洪水的效果,也达到了节約的目的。料石与块石相此,按当地价格每立米可节約十点五二元,二千立米石料,可为国家节約二万余元。这种革命性的改变,是学习毛主席著作,提高思想的結果。在去冬审定一九六六年整險計划时,这个段采取了領导、技术員、工人三結合的方法,在修防
There were twelve firemen in East Ash repair section, which was more than 31,000 meters long, accounting for 56% of the total length of the embankment. As the levee rises, the bank of the dam must be raised. In particular, the construction of the dam will be stepped up. Two thousand cubic meters of stone are required this year. In accordance with past practice, rubble rock heightening rubble, dredging dams with stone heightening, masonry dam is the use of stone heightening, the purpose is to find the same from top to bottom, beautiful and tidy. However, this year, masonry dam heightening part of the plan does not use material stone, use stone heightening. This will not only serve to defend the flood effect, but also achieve the purpose of saving. Stone and block stone phase, according to the local price per meter can save ten five two yuan, two thousand cubic meters of stone, for the country to save twenty thousand yuan. This revolutionary change is the result of studying Chairman Mao’s work and raising his mind. During the winter review of the 1966 reckoning plan, this section adopted a combination of leadership, technicians and workers.