论文部分内容阅读
锦屏一级水电站混凝土双曲拱坝为当今世界最高双曲拱坝,大坝混凝土施工组织和实施难度较大,为科学组织大坝混凝土浇筑施工、合理安排其浇筑工期,在投标阶段拟通过计算机模拟仿真系统辅助编排锦屏一级水电站大坝混凝土施工进度,以为后期实施提供技术指导和参考。
The concrete double curved arch dam of Jinping I Hydropower Station is the highest double curvilinear arch dam in the world. It is difficult to construct and implement the concrete for the dam construction. The construction of the concrete dam for the scientific organization is made and the pouring construction period is reasonably arranged. The bidding stage Computer simulation system assisted the construction of Jinping I dam concrete construction schedule to provide technical guidance for the later implementation and reference.