论文部分内容阅读
随著九年来全国水利电力基本建设事业的发展,尤其是1958年工农业的全面大跃进,水利电力工程建设的测量工作得到相应的飞跃发展,取得巨大的成绩。过去几年来水利电力工程测量工作的发展,特别是1957年整风反右、双反运动的胜利,给1958年测量工作的跃进准备了充分的物质条件和思想基础,1958年测量工作的跃进,反转来又推动了测量工作本身进一步的发展,目前全国水利电力系统的勘测设计单位,拥有的测量队伍在两万人左右,担负着为绝大部分大中型水利电力工程的设计施工提供必须的测量资料的巨大任务;至于在广大农村和专县兴建的小型和部分中型水利电力工程建设中,担任测量工作的农民测量人员,就更难统计。
With the development of the country’s water conservancy and electric power infrastructure construction in the past nine years, especially the comprehensive leap forward of industrial and agricultural development in 1958, the measurement work for water conservancy and electric power engineering construction has achieved corresponding leap development and has achieved tremendous results. The development of water conservancy and electric power engineering survey work in the past few years, especially the victory of the anti-rightist and anti-reverse movements of the rectification movement in 1957, provided sufficient material conditions and ideological foundations for the leap forward in the measurement work in 1958. The measurement work in 1958 was a leap forward. The transfer has also promoted the further development of the survey itself. At present, the survey and design units of the national water conservancy and electric power system have a survey team of about 20,000 people and are responsible for providing necessary measurements for the design and construction of most large- and medium-sized water conservancy and electric power projects. The enormous task of data; As for the construction of small-scale and some medium-sized water conservancy and electric power projects built in vast rural areas and counties, it is even more difficult for the peasant surveyors who serve as measurement work.