济南建筑材料工业集团公司2000t/d水泥生产线自1998年11月19日奠基以来,经过设计单位天津水泥工业设计研究院及公司全体职工的共同奋战,已于8月21日19点15分投料,20点产出第一批熟料。8月26日至29日1时的72小时内,烧成系统投料量为986?
The 2000t/d cement production line of Jinan Construction Materials Industry Group Co., Ltd. has been laid on 19 November 1998. After the joint efforts of all the employees of the design institute Tianjin Cement Industry Design and Research Institute and the company, it was charged at 19:15 on August 21. 20 points produced the first batch of clinker. In the 72 hours of 1 o’clock on August 26 to 29, the firing system has a capacity of 986?