论文部分内容阅读
在市政桥梁预应力施工的时候,务必要充分的与实际情况相结合,利用科学、合理的预应力技术在最大限度之上强化市政桥梁施工的质量。针对过程之中出现的问题要及时的进行分析,强化施工技术的应用的力度,严格依照相应的施工工艺来按部就班的予以实施,慢慢的加大工程质量,保障工程建设的最终效果,在具体进行施工的过程之中,预应力技术在自身应用的过程之中都会发生部分问题,将施工过程之中每一个阶段的质量控制,在最大限度之上来充分的保障市政桥梁施工的质量。鉴于此,本文主要分析市政桥梁工程中的预应力施工技术。
In the municipal bridge prestressed construction, it is necessary to fully combine with the actual situation, the use of scientific and reasonable prestressing technology to the maximum extent to strengthen the quality of municipal bridge construction. For the problems arising in the process to be timely analysis, strengthening the application of construction technology, in strict accordance with the corresponding construction technology to be implemented step by step, slowly increase the quality of the project to protect the construction of the final results in the specific During the construction process, some problems occur in the process of self-application of prestressed technology, and the quality control of each stage of the construction process will be fully guaranteed to the maximum extent. In view of this, this article mainly analyzes the prestressed construction technology in the municipal bridge project.