论文部分内容阅读
由水电部规划设计院和水电部成都勘测设计院(《规范》主编单位)联合召开的《水工隧洞设计规范》(初稿)讨论会,于1983年6月4日至14日在成都召开。会议按专题介绍、小组讨论和大会交流三个阶段进行。会议文件除《规范》正文、附录及编写说明外,还有“水工隧洞的围岩分类”、“隧洞的布置和线路选择”、“锚喷衬砌在水工隧洞中的应用”等35份专题撤告和有关资料。与会代表对《规范》(初
The Symposium on “Code for Design of Hydraulic Tunnels” (Draft) jointly held by Planning and Design Institute of Ministry of Water Resources and Electricity and Chengdu Survey and Design Institute of Ministry of Electric Power and Electric Power (“Code”) was held in Chengdu from June 4th to 14th, 1983. The conference was conducted in three phases according to the presentation, group discussions and the conference exchange. Meeting documents In addition to the text of the “norms”, appendix and the preparation of the description, there are “Surrounding Rock classification of hydraulic tunnel”, “the layout of the tunnel and the selection of routes”, “anchor spray lining in the hydraulic tunnel application” 35 Special withdrawal and related information. Participants on the “norms” (beginning