谏壁电厂四期和五期扩建工程为7~10号4台30万千瓦机组。9号机组主厂房吊装现已基本结束,10号机主厂房混凝土构件正在预制。下面简要介绍本工程主厂房混凝土结构吊装的施工方案和体会.
The fourth and fifth extensions of the Jianbi Power Plant are four units of 300,000 kilowatts of No. 7-10. The hoisting of the main building of Unit 9 is now basically completed, and the concrete structure of the main plant of Unit 10 is being prefabricated. The following briefly introduces the construction plan and experience of the concrete structure of the main plant of the project.