【摘 要】
:
葛洲坝水利枢纽工程分两期施工,一期工程先修建二、三江建筑物。自1974年底主体工程复工以来,一期工程已基本完成。今年10月,大江截流戗堤非龙口段已开始进占,预计到今年年
【机 构】
:
长江流域规划办公室施工处导流设计科
论文部分内容阅读
葛洲坝水利枢纽工程分两期施工,一期工程先修建二、三江建筑物。自1974年底主体工程复工以来,一期工程已基本完成。今年10月,大江截流戗堤非龙口段已开始进占,预计到今年年底前后就可以完成截流合龙。利用大江围堰挡水,1981年可实现三江船闸通航和二江电厂发电。此后,继续进行大江建筑物施工(参见图1)。
Gezhouba dam project in two phases of construction, a project to build two, Sanjiang buildings. Since the main project was resumed at the end of 1974, the first phase of the project has been basically completed. In October of this year, the non-Longkou section of the main river closure embankment has begun to take over and is expected to be completed by the end of this year. With the use of the Dajiang cofferdam, in 1981 the navigation of the Sanjiang Ship Lock and the power generation of the Erjiang Power Plant can be realized. Since then, construction of Oe Building has continued (see Figure 1).
其他文献
摩托车维修部经常给各种摩托车加进口机油,大都集攒了一些盛过进口机油的小圆桶。我将此小圆桶,用剪刀将上部剪掉(如果是两头封装的,便从中间剪成两个),然后将剪口修整平滑,
Lanthanum chloride α D ribopyranose pentahydrate complex was prepared and speculated its structure from the similar IR spectra of corresponding praseodymium
在广泛调研的基础上,通过一系列试验,最终研究出一种由有机磷酸酯-有机膦酸-多元共聚物-Zn组成的新型高效水处理配方CS-207,并成功地在三套循环水系统进行了工业应用。结果表明,该配方缓蚀阻
优点:底盘优良;发动机罩设计新颖;控制装置良好。缺点:空间狭窄;速度太慢;价格昂贵。评语:好车,但并不优异。默谢台斯·奔驰300SL—24车基本型的成本费用大大超过了5万英磅
安菲尼多用途车(fini MPV) B型 (发动机总排量:2954ml) A型 (发动机总排量:2954ml) A型 真皮座椅规格(总相量:2954ml)
Fini MPV type B (total engine displacement: 2954m
纸质空气滤清器具有结构简单、体积小、重量轻、保养方便等特点。其滤清效率高,灰尘透过率仅有0.1~0.3%。使用纸质空气滤清器能有效地减轻气缸和活塞环的磨损,延长发动机使用
针对地下盐膏层蠕变导致油层套管变形、破漏 ,造成井况恶化的特点 ,中原油田在卫2 81井首次采用了华北油田钻井工艺研究所设计的双层组合套管固井工艺 ,实践证明该工艺对防止
目的 探讨进展期胆囊癌的超声特征、临床应用价值。方法 对经手术病理证实的 54例进展期胆囊癌与超声结果进行了回顾性对比分析。结果 超声图像分为四型 :壁增厚型、蕈伞
本文是在丹江口水电站1、2、4号机上为“○七工程”所作冲击负荷试验研究的初步总结。文中指出了水电机组不能适应冲击负荷的问題所在,提出了解决这些问题的途径和措施。
Th
大化水电站位于广西红水河上,控制流域面积112,200平方公里,年平均流量1,900立方米/秒。坝址岩石为薄层状泥岩和灰岩互层。电站正常高水位为155米高程,相应库容为3.54亿立方