北仑港设备安装任务,经单机无负荷试车,已于八一年六月底交付宁波港务局进行负荷试车。在安装期间为保证工程质量采取了“两编,一交,一填卡”的做法,即开工前编制安装工艺设计和安装要领书,施工中按工序进行技术交底,施工后填写分部检验记录卡,逐项检查,逐项填写,做到每道工序严格检查,认真记录,保证单机的质量,再由各个单机的良好质量,保证整个工程的良好质量,这样环环扣紧,基础扎实,交工时竣工原始资料完整。北仑港安装工程共有27个单项工程,经中、日双方共同检查有25项达到良好标准,两项为合格,使优良率达到92.6%。经我们自己全面复查,对阴
The Beilun port equipment installation task, after a single-machine no-load test, was delivered to the Ningbo Port Authority at the end of June 2011 for a load test. During the installation period, in order to ensure the quality of the project, the “two-part, one-pass, one-fill card” approach was adopted. Before the start of work, the installation process design and installation instructions were prepared. During the construction process, technical disclosure was performed according to the procedures. After the construction, the inspection records of the division were filled out. Cards, one-by-one inspection, one-by-one entry, so that each process is strictly inspected, carefully recorded to ensure the quality of the single machine, and then the good quality of each single machine, to ensure the good quality of the entire project, so that the ring buckle fast, solid foundation, Completion of the original data when completed. There are 27 individual projects in the Beilun Port installation project. 25 joint inspections by China and Japan have achieved good standards, and two of them are qualified, making the excellent rate 92.6%. Through our own comprehensive review, the Yin