论文部分内容阅读
中国水利水电第十四工程局有限公司机电安装事业部(以下简称“机电安装事业部”)始建于1957年,至2017年9月底,安装水轮发电机组372台,总装机容量超过33869兆瓦。机电安装事业部技术实力雄厚、经验丰富、品牌影响力强,施工水平居行业领先,特别擅长高水头大容量(含可逆式)水轮机组的安装。具备年装机容量5200兆瓦、金属结构制作安装15万吨、风电塔筒制造6万吨的能力,形成了机电安装调试和金属结构制作安装两大核心业务,
The Fourteenth Engineering Bureau of China Water Resources and Hydropower Engineering Co., Ltd. Electromechanical Installation Division (hereinafter referred to as “Mechanical and Electrical Installation Division”) was founded in 1957, to the end of September 2017, installing 372 hydroelectric generating units with a total installed capacity of more than 33869 MW. Mechanical and Electrical Installation Division is strong in technology, experienced, strong brand influence, the industry-leading construction level, especially good at high head large capacity (including reversible) turbine installation. With annual installed capacity of 5200 MW, the production and installation of 150,000 tons of metal structures, wind power tower manufacturing capacity of 60,000 tons, the formation of the mechanical and electrical installation and commissioning of the two major manufacturing and installation of metal structures core business,