吴泾八期2×600MW工程从1996年6月与我公司签订主设备订货合同以来,历经59个月在2001年5月6日顺利完成2号机组168小时试运行。这标志着这项工程的“塑精品,创名牌”的目标已经基本达到。回顾吴泾八期的日日夜夜,SEC电站事业部贯彻精品意识,精心工作,在质保和服务工作中又上了一个新台阶,为工程的建设添砖加瓦,同时也使自身的建设有了进一步提高。一、质保工作从吴泾八期工程筹建处与我公司商谈主设备技术协议和合同开始,公司质保部就参加质保条款的商谈,并与筹建处签订了设备监造条款。在设备制造时,公司成立了监检网络,将公司所属厂的检验部门中最有能力和最有经
Since the 8th phase of Wujing 8×600MW project signed the contract for main equipment with our company in June 1996, it successfully completed the 168-hour trial operation of Unit 2 on May 6, 2001 after 59 months. This marks the goal of this project’s “plastic boutique, a brand name” has been basically achieved. Recalling the day and night of the 8th issue of Wusong, the SEC Power Station Division has carried out quality awareness and meticulous work. It has taken a new step in the quality assurance and service work, contributed to the construction of the project, and has also further improved its own construction. . First, the quality assurance work began with the negotiation of the main equipment technology agreement and the contract with the company from the preparation stage of the Wusong 8th project. The company’s quality assurance department negotiated the terms of the warranty, and signed the equipment supervision terms with the preparation office. At the time of equipment manufacturing, the company established a supervisory inspection network, which is the most competent and the most capable of the inspection departments of the company’s factory.