巫山长江公路大桥是一座主净跨为 4 6 0 m的中承式钢管混凝土拱桥 ,主拱肋采用斜拉扣挂法无支架缆索吊装施工 ,已于 2 0 0 3年 4月中旬成功合拢。该桥是对我国无支架缆索吊装系统的进一步完善。其吊装施工中的一些关键技术 ,在得到进一步突破的同时 ,也给拱桥的建造提供了技术借鉴
The Wushan Yangtze River Highway Bridge is a half-way CFST arch bridge with a main net span of 460 m. The main arch rib is supported by a cable-stayed cable-stayed suspension cable and was successfully closed in mid-April 2003. The bridge is to further improve China’s unshielded cable hoisting system. Some of its key technologies in hoisting construction, while getting further breakthroughs, also provide a technical reference for the construction of arch bridges