论文部分内容阅读
中国铁路总公司铁总办函〔2013〕309号(2013年6月20日)2013年4月20日和5月24日,卢春房副总经理主持召开会议,研究加快铁路工程建设信息化推进工作。何华武总工程师,赵国堂、王同军副总工程师出席会议。总公司计划统计、建设管理、科技管理部,运输局(调度部、工务部、信息化部),工程监督总站,鉴定、工管、信息技术中心等单位负责人及有关人员参加了会议。中铁工程、建筑总公司,铁科院,铁一、二、三、
China Railway Corporation Tie Zongbai letter [2013] No. 309 (June 20, 2013) On April 20, 2013 and May 24, 2013, deputy general manager Lu Chunfang presided over a meeting to study and speed up the progress of railway construction informationization . He Huawu Chief Engineer, Zhao Guotang, Wang Tongjun, deputy chief engineer attended the meeting. Heads of planning and statistics, construction management, science and technology management department, transportation bureau (dispatch department, Ministry of Public Works, Ministry of Information Industry), engineering supervision terminus, appraisal, engineering management, information technology center and other units attended the meeting. China Railway Engineering, Construction Corporation, aSTRI, iron one, two, three,